Contact Us
RoadVision AI Private Limited
2nd Floor, C-9, Above PNB Bank,
SDA Community Centre,
Opposite IIT Delhi Main Gate
New Delhi, India – 110016
© 2024 | RoadVision AI | All rights reserved
In road construction, achieving the desired strength and durability in pavement layers is essential. One of the most vital aspects that determines the performance and longevity of Wet Mix Macadam (WMM) layers is proper compaction. As per the specifications laid down in IRC Code 109, proper compaction ensures uniform strength, reduces permeability, prevents deformation under traffic loads, and enhances the lifespan of the pavement. This blog elaborates on the importance of compaction in WMM, techniques involved, IRC guidelines, and implications of improper compaction.
Wet Mix Macadam (WMM) is a granular base/sub-base layer composed of graded aggregates and granular materials premixed with water in a plant and laid with a paver. It is then compacted using vibratory rollers to achieve the required density. WMM serves as a critical structural layer and base for bituminous or concrete surfacing.
Compaction is the process of densifying a material by removing air voids through mechanical means. In the context of WMM, compaction has the following vital roles:
As per IRC:109, achieving the specified field density ensures that the WMM layer will possess the structural strength necessary to support the pavement loads.
Properly compacted layers distribute vehicular loads evenly to sub-layers, reducing stress concentrations and potential failures.
Compaction prevents rutting, shoving, and settlement by reducing voids that would otherwise compress under repeated traffic loading.
Less void content due to effective compaction reduces water ingress, which is a common cause of subgrade weakening and pavement deterioration.
A dense, well-compacted layer is less prone to weathering, abrasion, and structural fatigue, thus increasing the pavement’s life.
The IRC:109 code provides detailed guidance for the construction and quality control of WMM layers, including compaction procedures:
Failure to achieve proper compaction leads to:
To align with IRC Code 109, follow these best practices:
As per IRC recommendations, quality assurance in WMM involves:
Proper compaction in WMM layers is not merely a procedural requirement; it is a cornerstone for building resilient, long-lasting roads. Following the guidelines of IRC Code 109, especially regarding density targets, equipment use, and moisture control, ensures that the pavement foundation is robust and durable. Investing attention in the compaction stage pays off significantly in reduced maintenance and improved road performance.
RoadVision AI is transforming road infrastructure development and maintenance with its innovative AI in road maintenance and AI in road construction solutions. By utilizing cutting-edge computer vision technology and digital twin models, the platform conducts comprehensive road safety audits, enabling the early detection of potholes, cracks, and other surface issues for timely repairs and enhanced road conditions. The use of AI in road safety also extends to traffic surveys, providing data-driven insights to tackle challenges like traffic congestion and optimize road usage. Focused on building smart roads, RoadVision AI ensures full compliance with IRC Codes, empowering engineers and stakeholders to reduce costs, minimize risks, and elevate road safety and transportation efficiency.
It ensures the WMM layer is strong, stable, and durable, minimizing voids and water entry. IRC Code 109 mandates it to avoid deformation and ensure road longevity.
Poor compaction causes rutting, water damage, early cracking, and reduces pavement life, leading to costly repairs and safety issues.
Compaction is checked using Sand Replacement, Core Cutter, or Nuclear Gauge tests and compared with lab density values as per IRC 109.