IRC Code-82-2015: Planning and Implementing Maintenance Activities for Bituminous Roads

IRC Code-82-2015 offers comprehensive guidelines for the maintenance of bituminous roads in India. Developed by the Indian Roads Congress, this code focuses on extending the life of pavements, enhancing road safety, and ensuring optimal serviceability. This blog aims to provide a detailed, easy-to-understand overview of how to plan and implement effective maintenance strategies based on this IRC code.

Bitumen Spray Images – Browse 454 Stock Photos, Vectors, and Video | Adobe  Stock
Bituminous Road Maintenance

Why Bituminous Road Maintenance Is Essential

Maintenance of bituminous roads is not just a repair activity—it’s a long-term investment. According to IRC Code-82-2015, proper maintenance ensures:

  • Prolonged pavement life
  • Improved ride quality
  • Lower vehicle operating costs
  • Reduced road accidents
  • Optimized life-cycle costs

By preventing the early deterioration of road surfaces, well-planned maintenance helps in conserving financial resources and improving user satisfaction.

Types of Maintenance Activities as Per IRC Code-82-2015

1. Routine Maintenance

Routine maintenance comprises activities carried out regularly to keep the road in a serviceable condition. These include:

  • Cleaning of road surfaces and drains
  • Sealing of cracks
  • Filling of potholes
  • Maintenance of shoulders and road signs
  • Repainting of road markings

These works are simple but critical, especially in preventing minor issues from becoming major problems.

2. Preventive Maintenance

This is carried out when the pavement is still in good condition to delay the onset of deterioration. It involves:

  • Fog sealing
  • Slurry sealing
  • Micro-surfacing
  • Thin overlays

Preventive maintenance helps reduce the frequency and cost of future repairs and increases the overall pavement life.

3. Periodic Maintenance

Periodic maintenance is more extensive and usually includes resurfacing activities. This is planned at regular intervals based on the pavement’s age or condition assessment. It includes:

  • Premix carpet laying
  • Surface dressing
  • Application of bituminous concrete layers
  • Dense graded or stone matrix asphalt overlays

Periodic renewal ensures that the pavement remains structurally sound and continues to provide a smooth driving surface.

Steps for Planning Maintenance Activities

1. Pavement Condition Survey

The first step involves inspecting the road surface for defects. IRC suggests:

  • Conducting surveys twice a year—before and after the monsoon.
  • Recording observed distresses using standardized forms (Proforma 1 and 2).
  • Classifying road sections based on severity of defects such as cracks, potholes, rutting, and bleeding.

2. Pavement Rating System

Road stretches are rated based on a numerical system considering the extent and severity of distresses. Ratings help identify the maintenance needs:

  • Ratings of 4 and 5: Good condition – suitable for preventive maintenance
  • Rating of 3: Fair condition – timely action needed
  • Ratings of 2 and below: Poor condition – requires periodic renewal

3. Pavement Maintenance Management System (PMMS)

A PMMS is a decision-support system that helps in:

  • Maintenance prioritization
  • Selecting suitable treatment methods
  • Estimating lifecycle costs
  • Preparing annual maintenance programs

A data-driven approach is crucial for efficient fund utilization.

Selecting Appropriate Maintenance Treatments

Choosing the right treatment depends on several factors:

  • Type and severity of pavement distress
  • Traffic volume and axle load
  • Climatic conditions
  • Budget constraints
  • Expected service life of the treatment

For example:

  • Fog seals and rejuvenators are ideal for oxidized surfaces.
  • Slurry seals or micro-surfacing work well for minor cracks and texture loss.
  • Thin overlays are suitable for roads showing surface roughness but still structurally sound.

Materials Recommended for Bituminous Road Maintenance

The code specifies use of the following materials based on repair needs:

  • Viscosity-graded bitumen (VG-10, VG-20, VG-30, VG-40)
  • Bitumen emulsions (IS 8887 compliant)
  • Modified binders for improved performance
  • Cold mix materials for patching in wet or emergency conditions
  • Rejuvenators and tack coats for improving bond

Proper material selection ensures durability, cost-effectiveness, and better performance.

Execution and Equipment Requirements

Timely execution of maintenance work requires the mobilization of trained manpower, quality materials, and modern equipment such as:

  • Bitumen sprayers
  • Pothole patchers
  • Hot mix and cold mix plants
  • Mechanical brooms and rollers
  • Hand tools and safety gear

Mechanization not only improves quality but also speeds up work, reduces labor fatigue, and enhances worker safety.

Traffic Safety and Work Zone Management

According to IRC Code-82-2015, maintaining traffic safety during maintenance operations is critical. It recommends:

  • Developing a Work Zone Traffic Management Plan (WTMP)
  • Using appropriate signs, cones, barricades, and flagmen
  • Ensuring lane closures are clearly marked
  • Setting speed limits near work zones (e.g., 20 km/h post surface treatment)
  • Maintaining access for pedestrians and emergency vehicles

Efficient traffic management minimizes congestion, protects workers, and ensures road user safety.

Quality Control and Monitoring

For every maintenance activity, strict quality control is essential. IRC Code recommends:

  • Supervision by experienced engineers
  • Periodic testing of materials
  • Documentation of all works
  • Calibration of equipment before use
  • Field testing during and after execution

Post-maintenance evaluation ensures that the repairs are performing as expected and helps in fine-tuning future strategies.

Challenges and Best Practices

Some common challenges include:

  • Delay in funding and tendering
  • Monsoon-related constraints
  • Shortage of trained personnel in remote areas
  • Traffic diversions in congested zones

To overcome these, best practices include:

  • Developing long-term maintenance plans
  • Training and certifying maintenance staff
  • Using mechanized units and mobile maintenance vehicles
  • Pre-monsoon preventive works

Conclusion

IRC Code-82-2015 serves as an essential guideline for maintaining India's bituminous road network effectively. It emphasizes timely and well-planned interventions to extend pavement life, reduce maintenance costs, and enhance user satisfaction. By following the code’s principles, highway authorities, contractors, and engineers can ensure smoother, safer, and more durable roads.

RoadVision AI is transforming infrastructure development and maintenance by harnessing artificial intelligence and computer vision AI to revolutionize road safety and management. By leveraging advanced computer vision artificial intelligence and digital twin technology, the platform enables the early detection of potholes, cracks, and other road surface issues, ensuring timely repairs and better road conditions. With a mission to build smarter, safer, and more sustainable roads, RoadVision AI tackles challenges like traffic congestion and ensures full compliance with IRC Codes. By empowering engineers and stakeholders with data-driven insights, the platform reduces costs, minimizes risks, and enhances the overall transportation experience.